i. Power Grid extension West Nile Region, Uganda |
TEATT Ltd was involved in surveying, planning, designing and construction of 33KV /LV electrical power line over a distance of 70 km. from Arua to Koboko towns with associated Low voltage ABC and transformer installations Contractor: Consortium of LTL Projects(Pvt)& LTB Leitungsbau GmbH, 2014) Client: Uganda Electricity Distribution Company Ltd |
ii. 33KV/LV Electrical Power line Extension, Kashenyi -Nyaruzinga Trading centers ( Rukungiri district) |
This project involved construction of a 33KV/LV electrical power line extension from Kashenyi Trading Centre to Nyaruzinga Trading Centre Contractor: A2Z Maintenance and Engineering Services Limited Client: Rural Electrification Agency (REA) |
iii. Installation of a Transformer structure for JUKAS Construction Apartments -Lubowa,Uganda. |
EATT Ltd Planned, designed, supplied and constructed an electrical power line High Voltage with transformer substation 11KV/100KVA/415V/240V at Lubowa. Uganda. Client: Jukas Construction Company Ltd EATT technicians positioning a Transformer 11kv/100KVA onto the platform with help of a self-loader |
iv. 11KV feeder Line diversion at Krish Developers site – Bugolobi, Uganda |
EATT Ltd executed the designing, diversion and restoration of power on High Voltage 11KV feeder combined construction with 3-phase prepaid system-3poles diverted from client’s site of construction of Business center in Bugolobi , Bandali Rise near DFCU bank Client: Krish Developers Limited. Preparing to erect a flying-angle pole with a self loader |
v. High Voltage with Transformer Substation 11KV/100KVA/415V/240V Construction -Kabalagala, Nsambya, Ggaba Road |
EATT was involved in planning, designing, supplying and construction of an electrical power line High Voltage with transformer substation 11KV/100KVA/415V/240V at Kabalagala-Nsambya on Ggaba Road Client: CK and Company Limited |